The Ridgeway, Lisarow

The scope of works included major structural changes — from removing the original roof and internal load-bearing walls, to re-pitching the beachside roofline for elevated views and architectural impact. A three-storey residential lift was seamlessly integrated into the new design, offering accessible living without compromising on style.
Belmont Wetlands State Park – Campground & Amenities
Portable Buildings Relocation

Baker Built successfully remediated 2 hectares of contaminated land, specifically asbestos, and transformed the site into a sustainable and income-generating asset for the State Park. Located at Redhead Beach, NSW, the project aimed to develop formalised camping facilities while ensuring the land was properly remediated and environmentally safe.
Central Coast Grammar School – Portable Building Relocation & Renovations
Portable Buildings Relocation

Baker Built delivered a seamless multi-stage relocation project involving six demountable classrooms. Works included site establishment, building separation and transport, reassembly, engineering footings, and reinstatement of internal and external finishes. Minimal disruption and strong stakeholder communication were maintained throughout the build, demonstrating Baker Built’s capability in delivering complex school infrastructure projects.
Forster Community Centre – Commercial Kitchen

Baker Built delivered a complete commercial kitchen fit-out for the Forster Community Centre, transforming an empty internal shell into a fully compliant, hygienic, and highly functional kitchen space.
Glenvale School – Contamination Remediation

Working closely with project consultants, our team removed contaminated material and replaced it with clean fill, delivering a safe and compliant outcome. Upgrades also included stormwater infrastructure improvements and new concrete paving, ensuring long-term durability and safer daily access for school users.
City of Ryde – Kayak Launching Facility

This infrastructure upgrade provides the local community with a low-risk, user-friendly entry point to the river while ensuring long-term durability with minimal maintenance. The final outcome balances practical performance with visual harmony along the foreshore.
Killara High School – Curved COLA

Design and construction of 32m x 28m curved roof COLA with ceiling linings, lighting, power, PA system, and access reinstatement works. Project included re-engineering due to poor ground conditions and installation within a constrained live school environment.
Leura Cascades – Amenities Block & Picnic Facilities

Delivered in a sensitive heritage location, this project required extensive site clearing, civil works, and full construction of both an amenities building and detached picnic shelter. Accessibility, durability, and integration with the natural landscape were key priorities. The successful delivery of the project has led to Baker Built being awarded a second contract by Blue…
Merriwa Central School – Access Ramps, Paths & Stairs

Baker Built was engaged by the NSW Department of Education to complete a full-scale upgrade of the access infrastructure at Merriwa Central School. This project aimed to enhance site-wide accessibility while complying with the Disability Discrimination Act (DDA), ultimately improving both safety and usability for all students, staff, and visitors.
Merriwa Public School – Sports Court

Delivered for the NSW Department of Education, this project involved the full construction of a concrete-based outdoor court designed for safe, multi-sport use by students. The build included site prep, precision slab pouring, and high-performance surfacing — all completed with safety and usability front of mind. The completed facility now supports a wide range of…
